lower-sabor-bg

Lower Sabor Irrigation Development Project is located in Tembelion Location, Moiben Sub-location, Eldoret East Sub County in Uasin Gishu County. The project is targeting to develop irrigation infrastructure on 2,000 acres to benefit 750 farmers and is currently 94% complete.

The project components are:

  • Intake works to off take 196l/s for irrigation of the entire scheme
  • Main line
  • Conveyance system for 4 No. sub branches
  • Distribution system for 6No. distribution lines
  • Infield system for 750 No. farmers